Discuss a project
Asset Construction Technologies. People, equipment, solutions, results. Financial, security, infrastructure and installation.

Stronger infrastructure.
Brighter tomorrows.

Bank construction. Equipment installation.
Rigging and bring-live support.

Explore our expertise

Illustrative installation. Actual finish details vary by location.

A full range of expertise.

From bank construction and equipment handling to ATM, ITM and TCR installation and bring-live support, explore the work ACT can bring to your project.

ATM & ITM

Equipment. Positioned for its setting.

Through-the-wall, drive-up, walk-up, lobby, and island configurations. The equipment model and its location shape the installation.

  • Equipment model and manufacturer information
  • Site readiness, access, and positioning
  • Power and communications coordination
Explore this service

Bank construction

The physical setting matters.

Bank construction and turnkey operations connect the physical site with the financial equipment it needs. Discuss your facility, proposed equipment location, and project requirements with ACT.

  • Photos, drawings, and existing conditions
  • Physical changes and project boundaries
  • Site access and coordination with other contractors
Explore this service

Rigging & installation

From arrival to final position.

Rigging and installation for ATMs, ITMs, and teller cash recyclers (TCRs). Equipment dimensions, weight, handling requirements, and the route into the site shape the plan.

  • Access route, turns, doorways, and working space
  • Equipment dimensions and handling information
  • Delivery arrangements and on-site contacts
Explore this service

Software & bring live

The final connection.

Software updates, downloads, and bring-live support coordinated with the equipment requirements and the bank or vendor technical team.

  • Model and software requirements
  • Responsible technical contacts
  • Installation date and bring-live window
Explore this service

Built around
your location.

Some configurations overlap. A drive-up or walk-up unit may be through-the-wall or freestanding.

Through-the-wall

The operating face integrates into an exterior wall, with service access behind the unit. Share opening dimensions, wall construction, equipment specifications and photographs of both sides so the fit and access can be reviewed.

Discuss this installation
Drive-up

Customers approach in a vehicle. Review the lane layout, stopping position, island or wall configuration, and available work area. Include photographs showing the approach and any existing protective equipment.

Discuss this installation
Walk-up

Customers approach on foot. Discuss the pedestrian route, surrounding space, unit position, and access for installation.

Discuss this installation
Lobby

Equipment sits inside the institution. Doorways, turns, floor transitions and the final position shape the handling route. Branch activity, installation access and the work window should be discussed together.

Discuss this installation
Island

Freestanding equipment sits on a separate island. Site drawings, supporting surface, connections, and delivery access help define the scope.

Discuss this installation

Based in Slidell.
Working across the region.

Explore local, regional and extended drive-time zones. Contact our team to confirm your location and project requirements.

Estimated drive-time zones
30-minute inner boundaryBeyond 6 hours

Loading coverage map…

Projects nationwide are welcome. Outside our mapped area, customers arrange equipment shipping and site logistics. Contact ACT to confirm your project.

Estimated drive times from Slidell. Zoom in for roads and cities, or contact ACT to confirm coverage.

Confirm your project location
How these estimates were made

Calculated once from OpenStreetMap roads on October 11, 2026, using road distances, one-way directions, posted speed caps and conservative speeds by road type. Boundaries are interpolated between roads and clipped to land and mapped lakes.

This is a regional planning estimate, not a navigation service. It excludes traffic, stops, turn delays and turn restrictions. The regional extract covers interstates and major highways; local roads are included around Slidell. Exact addresses may take longer or use different routes. The same estimate applies to day and evening work; 9 a.m. and 5 p.m. arrival times should be planned per project.

View calculation sources · Report an OpenStreetMap issue

Talk to the people
behind the work.

Meet ACT

Built for your
next project.

Early plans are welcome. These details help us understand the work, the site, and the people who need to be involved.

What’s changing?

Tell us whether you’re replacing equipment, adding a unit, or preparing a new location. Include the ATM, ITM or TCR model and any available dimensions or handling information.

Where will it go?

Share the location, installation type, site photos and available drawings. Note entrances, turns, working space and the proposed final position.

When can work happen?

Include target dates, branch operating hours and access restrictions. Identify your on-site contact and any delivery arrangements already in place.

Who’s involved?

Let us know which bank, equipment vendor and technical contacts are involved. Discuss site readiness, connections and the intended bring-live window with our team.

Start your project conversation

Let’s bring your
project together.

Share the equipment, site location, target dates, and the work you need. A clear scope starts with a conversation.

Discuss a project